C02 ยท Lesson 1 of 22 ยท 13 min ยท 5 hands-on tasks

Cost Behaviour

Trailhead Bikes sells $50M of bikes a year and still loses $4M. Before anyone can fix it, someone has to know how each cost moves when volume moves. Sort Trailhead's costs into fixed, variable, step and mixed, split a mixed cost with the high-low method, and see why 'cost per bike' is a moving target.

๐ŸŽฅ Watch it (3 min)

๐ŸŽฌ Situation

Larkfield Outdoor bought Trailhead Bikes for $120M. It builds three bikes in a factory in Colorado: the City commuter bike, the Trail mountain bike and the electric E-Cargo bike. Last year: $50M of sales and a $4M operating loss.

Theo has just joined as Trailhead's management accountant. Financial accounting (the last course) tells outsiders what happened. Managerial accounting is for insiders: what should we do next? Theo's first question is the simplest one: when we build more bikes, which costs go up?

๐ŸŽฎ Play

Spread the fixed costs. Move the volume and watch the cost of one bike change, even though no price or wage changed.

What does one bike cost?
Full cost per bike$1,102
Average selling price$1,020
Fixed cost per bike$443
Variable cost per bike$659
$0$1,000$2,000$3,00010,00020,00030,00040,00050,00060,000Bikes built in a year
Full cost per bike Average price

Slide the volume from 20,000 to 55,000. The variable cost never moves; the fixed cost per bike falls and falls.

Today: 49,000 bikes, $443 of fixed cost + $659 of variable cost = $1,102 a bike, above the $1,020 average price. Hence the loss.

Split a mixed cost. Factory power is part fixed (lights, heating, machines idling) and part variable (machines running). Use the high-low method: take the busiest and quietest months.

Six months of factory power bills
C9
ABC
1
2
3
4
5
6
7
8
9
10
11
  • C9: slope = (high cost โˆ’ low cost) รท (high bikes โˆ’ low bikes), =(C7-C2)/(B7-B2)
  • C10: fixed part = low month's cost โˆ’ slope ร— low month's bikes, =C2-C9*B2
  • C11: forecast = fixed + slope ร— 4,200
Check your line against April: $40,000 + $8 ร— 4,000 = $72,000, close to the real $72,300. The high-low method is quick; regression (course C04) uses every month.

๐Ÿท๏ธ Name it

Behaviour What it does as volume rises Trailhead example
Variable Total rises in step with units; cost per unit stays flat Frames, wheels, batteries, assembly pay per bike: $659 a bike on average
Fixed Total stays flat (within the relevant range); per unit falls Factory rent $4M, engineers, managers: $21.7M a year in all
Step Flat, then jumps in blocks A second shift ($2M a year) past 55,000 bikes
Mixed A fixed base plus a variable part Power: $40,000 a month + $8 a bike

The relevant range is the band of volume where these patterns hold. Trailhead's runs up to 55,000 bikes, the factory's capacity on one shift.

The high-low method: slope (variable cost per unit) = (highest-activity cost โˆ’ lowest-activity cost) รท (highest units โˆ’ lowest units). Fixed part = either month's cost โˆ’ slope ร— its units.

๐Ÿ–๏ธ Like you're five: a birthday party has a bouncy castle ($100, however many kids come) and party bags ($3 per kid). Invite more kids and each kid's share of the castle shrinks, but every party bag still costs $3.

Real life: most companies' reports mix all costs together and divide by units, giving one "cost per unit". That number is only true at one volume. Managers who quote it for a different volume (a big order, a slow month) make the wrong call. Real cost studies use more data than two months: regression, engineering estimates and asking the people who run the machines.

๐Ÿ”จ Do it: 5 tasks

0 / 5 done

Task 1 of 5 ยท Fixed or variable?

Trailhead pays $4M a year to rent its factory. If it builds 10% more bikes next year (same factory), what's the rent?

๐Ÿงฉ Case: "Each bike costs us $1,102"

โญ VIP

At Theo's first meeting, the sales director wants to win a big order from a bike-share company and asks: "What does a bike cost us?" The finance report says $1,102 per bike: $32.3M of variable costs plus $21.7M of fixed costs, divided by 49,000 bikes.

The bike-share company would add 5,000 bikes a year. What does Theo say about the $1,102?

What would you do? VIP members make the call, see what happens next across 2 decisions, and get the expert debrief.

๐Ÿ” Remember it

  1. As volume rises (within the relevant range), fixed cost per unit...

  2. A mobile phone plan with a $30 monthly fee plus 10 cents a minute is a...

  3. The 'relevant range' is...

Variable costs rise with every unit; fixed costs stay put within a relevant range; step costs jump when you add a shift or a machine; mixed costs are part of each (split them with the high-low method: slope = change in cost รท change in units). Fixed cost per unit falls as volume rises, so never quote one 'cost per unit' without saying at what volume.

๐Ÿ“… Use it Monday

Pick one cost you look after (a team, a tool, a building, a cloud bill). Ask: if we did 20% more work next month, what would this cost be? Write down whether it's fixed, variable, step or mixed, and where its next step up is.

Create a free account to track your progress.